Commercial construction

Retail shells, tenant upfit and renovation. A commercial job is a different animal from a house: the site work, the fire separation between tenancies, accessibility, and a permit path that runs through commercial plan review rather than residential.

Blackened steel Slate Honed marble

Before the finishes

What people actually
come to us about.

Nobody goes looking for a contractor in the abstract. These are the three things we hear first, and what we do about each of them.

Commercial plan review

A different submission, different reviewers and a different timeline. Planned into the schedule from the start.

Accessibility designed in

Routes, clearances, restrooms and hardware drawn from the beginning rather than corrected at inspection.

Fire separation between tenancies

Rated assemblies, penetrations and the inspections that go with them.

Phased and sequenced

Work zoned so the business keeps trading where the space allows it.

Out of hours where needed

Noise, dust and deliveries scheduled around your opening times.

One point of contact

Somebody who answers, and who knows what happened on site yesterday.

Resolved at concept

Parking counts, stormwater and site access studied before the layout is fixed.

Utilities and capacity

What the service will carry against what the use requires.

Structure engineered and stamped

A full set, coordinated with the mechanical and electrical design.

Our process

How a project actually runs.

Six stages, in order, with what you get at the end of each one. Nothing here starts until the stage before it is finished and signed off — which is the whole reason the schedule holds.

01

Site and zoning

Existing conditions, zoning, parking counts, stormwater and access. A by-right concept confirms the programme fits under current zoning, so the schedule is a permit schedule rather than an entitlement schedule.

What you get

A by-right site concept and a written zoning read.

02

Programme and shell

Tenancy sizes, demising strategy, service entries and where the loading and refuse go. Flexibility for tenants who do not exist yet is designed in now or not at all.

What you get

A shell plan with demising and services strategy.

03

Design and code

Fire separation between tenancies, egress, accessibility and energy code — designed in, not bolted on after review comes back. Exterior direction developed in parallel.

What you get

A coordinated design set and a code analysis.

04

Engineering

Structural, civil, and MEP as the project requires, coordinated and stamped. On a steel-framed shell the structural package drives the programme.

What you get

A stamped, coordinated set.

05

Commercial plan review

Submission, review comments and revisions, carried through to permit. This is a different queue and a different set of reviewers from residential work, and it takes what it takes.

What you get

Permit issued, with the review correspondence on file.

06

Construction and upfit

Site work, structure, envelope, then shell completion — and tenant upfit as spaces are let, sequenced so early tenants are not living on a construction site.

What you get

Certificate of occupancy, per tenancy where applicable.

What’s included

In every project we build.

  • Site work, parking and stormwater resolved at concept
  • Fire separation and accessibility designed in, not bolted on
  • Structural engineering and a stamped set
  • Carried through commercial plan review to permit

What moves the number

Where the cost actually goes.

We do not publish prices, because a price quoted before the drawings exist is a number that changes. These are the four things that decide it, so you know what you are choosing between.

Site work

Grading, parking, stormwater and utilities frequently cost more than people expect on a commercial site, and are decided at concept.

Structure

Steel, tilt-up or conventional framing changes the programme as much as the price.

Code separation

Fire rating between tenancies and accessibility requirements are not optional and not cheap. They are cheapest when designed in.

Upfit scope

Whether spaces are let as cold shell, warm shell or fully fitted changes the shell design itself.

In their words

Read our client reviews.

Robert is a great communicator and we love working with him and his team.

Adam Peter S.

They are always professional and strive to provide exemplary customer service.

Shannon L.

Common questions

About project work.

How is this different from residential work?

Different code, different reviewers, different queue, and a structural and civil scope a house does not have. The design–build principle is identical — define it fully before building it — but the definition takes longer and involves more consultants.

Can you do tenant upfit only?

Yes. Upfit within an existing shell is its own scope, and often its own permit.

How long does commercial plan review take?

It varies by jurisdiction and by submission quality. The one thing that reliably shortens it is a complete, coordinated set going in — most delay is revision cycles, and most revision cycles are avoidable.

Also from us

The rest of what we build.

Get started

Tell us about
your project.

A conversation and a walk through the rooms you are thinking about — no charge, and no obligation at the end of it.