Queen Boss Construction Queen BossConstruction

Whole-home renovation

Taking a house back to the studs and putting it back better. One contract, one schedule, one team accountable for all of it — which is the only way a project this size stays coherent.

White oak Lime plaster Blackened steel

Before the finishes

What people actually
come to us about.

Nobody goes looking for a contractor in the abstract. These are the three things we hear first, and what we do about each of them.

One drawing set, every room

The whole house designed before any of it is demolished, so the sequence is planned rather than discovered.

Long-lead items ordered early

Windows, cabinetry and appliances placed at the start. Most whole-home delays are a delivery date, not a trade.

A weekly schedule you can see

What happened, what is next and what would move it.

Opened and surveyed early

Selective demolition before the drawings are finalised, so the surprises land while the plan can still absorb them.

Services replaced, not patched

Wiring, plumbing and ductwork renewed rather than worked around. The walls are open exactly once.

A contingency that is named

Held openly, drawn on with a signed change order, and returned if it is not spent.

In residence or out, decided up front

The schedule and the price both depend on it, so it is a decision rather than a drift.

Zoned so half the house stays live

Where the layout permits, work is phased around a functioning kitchen and bathroom.

Dust, access and security

Partitions, a defined trade route and the house locked every night.

Two ways to do it

Back to the studs, and back better.

Whether the house wants to be warm and tailored or rough stone and timber, a whole-home renovation is one contract, one schedule and one team accountable for all of it. The photographs are references for a treatment rather than our own projects — bring us the one you keep coming back to.

Our process

How a renovation actually runs.

Six stages, in order, with what you get at the end of each one. Nothing here starts until the stage before it is finished and signed off — which is the whole reason the schedule holds.

01

Assess the whole house

Structure, roof, envelope, electrical, plumbing, heating and insulation, assessed as a system. On a project this size the question is not what to renovate but what order to renovate it in.

What you get

A condition report and a priority order.

02

One drawing set

Every room drawn as part of one scheme, so the house reads as a house rather than as eight separate projects. Circulation, sightlines and where the light falls are settled here.

What you get

A complete set: plans, elevations, sections, schedules.

03

Systems and performance

Services replaced rather than patched around, insulation and air-sealing brought up to current, and the heating sized to the house you will actually have.

What you get

A services and performance strategy, engineered where required.

04

Strip out

Back to the structure. This is when the house tells you what it really is, and when a contingency stops being theoretical.

What you get

A revised schedule after strip-out, with anything found priced in writing.

05

Rebuild in sequence

Structure, envelope, first fix, insulation, plaster, second fix, finishes — in order, with inspections at each stage. One project manager holds the whole sequence.

What you get

A weekly report: what happened, what is next, what we need from you.

06

Finish and hand over

Decoration, floors, joinery, external works, then commissioning of everything mechanical. Snagging is a walk with you, room by room.

What you get

Warranties, manuals and a closed snag list.

What’s included

In every renovation we build.

  • Every service replaced, not patched around
  • Insulation and air-sealing brought up to current
  • One drawing set covering every room
  • A schedule you can see, updated weekly

Need inspiration?

Our design team
will guide you.

Bring us the pictures you keep coming back to and our designers take it from there — working from the exterior style of the house, its proportions, its era and its materials, so every room reads as part of the same building rather than a set of separate good ideas.

One vision, carried through, inside and out. The image here is a reference for a treatment, not a photograph of one of our own projects.

Talk to a designer →
See 20 renovation ideas → Named, explained and costed in plain language
One great room under an open truss

What it takes

Three levels of renovation work.

The figure under each level is where that scope typically starts in the Charlotte market — a starting point, not a quote. What follows is the work those numbers buy: what falls inside each level, in the order the decisions actually get made. The same three names run through our finish levels below, because the two questions — how much work, and to what standard — are answered together.

Essentialessential scope · renovation

Starting at$275k

  • Homes under about 3,000 square feet
  • Kitchen or one other major room
  • Primary bathroom
  • New flooring through the main level
  • Paint throughout
  • Cosmetic updates to the remaining rooms
  • One drawing set covering every room
Typically 10+ weeks on site
Most chosen Signaturesignature scope · renovation

Starting at$400k

  • Everything in Essential, plus:
  • Roughly 3,000 to 5,000 square feet
  • Kitchen, primary bath and the secondary bathrooms
  • Laundry and mudroom rethought
  • Main floor opened, structure carried in the ceiling
  • Services replaced rather than patched around
  • Zoned HVAC
  • One continuous floor and one trim language
Typically 12+ weeks on site
Estateestate scope · renovation

Starting at$650k

  • Everything in Signature, plus:
  • Up to about 11,000 square feet
  • Every major area of the house
  • Major floor-plan redesign, stair relocated where it helps
  • Envelope rebuilt — air-sealing, insulation, windows
  • Ceilings raised or vaulted where the structure allows
  • Whole-house lighting plan, circuited and dimmed
  • Solid-core doors and a full trim package throughout
Typically 16+ weeks on site

Same Queen Boss craftsmanship at every level. Scope and finish are what move the number, never quality of workmanship — and you get an exact figure for your own project after the walk-through and the drawings, not before.

Define the finish

Selection & finish levels.

Two rooms of exactly the same size can cost dramatically different amounts, and the difference is selections. Cabinetry, countertops, tile, fixtures, lighting, appliances, doors, trim and hardware all move the number. These three tiers give us a shared language, so when you say “a $50,000 kitchen” we can talk immediately about what that realistically includes.

Essential~$135–$165 / SFFinishes only · excludes land, site work & structural

A clean, well-built home using quality builder-grade materials — the right choice when maximising budget toward square footage and structure matters most.

Most popularSignature~$165–$210 / SFFinishes only · excludes land, site work & structural

Upgraded materials and brands throughout that elevate everyday livability and long-term durability — without moving into full custom pricing.

Estate~$210–$275+ / SFFinishes only · excludes land, site work & structural

A full custom finish package with premium brands, natural materials, and designer detailing — built for clients who want the home to be a showpiece.

Per square foot, finishes only — excludes land, site work and structural. Same Queen Boss craftsmanship at every tier: the difference is customisation and material investment, never quality of workmanship.

Pre-construction investment

Three stages before a shovel goes in.

Pre-construction stageScopeInvestment
1 — Design & ArchitecturalComplete plan set: layouts, selections, construction drawings & renderings$2,000 – $4,000
2 — Structural EngineeringSite evaluation, calculations & engineer’s stamp (if required)$2,000 – $4,000
3 — City PermitPlan submission & city stamp · permit fees billed at costAt cost
Total pre-constructionFinal range confirmed once scope & areas are set$2,000 – $8,000+

Design, engineering and permit are priced separately from the build, so you can stop at any stage with a set of drawings you own outright.

Financing

Borrow against the house
it is going to be.

A renovation is usually worth more than the house was before it. RenoFi is built on that: their lending partners underwrite against your home’s after-renovation value rather than what it is worth today, which is why the number they can reach is so often larger than a standard home-equity offer.

Explore RenoFi → Opens RenoFi · a separate company
Up to 90%of after-renovation value, per RenoFi
$25k – $750krenovation home equity loans and HELOCs
Up to $75kpersonal loans, on credit and income
11×more on average than standard equity, per RenoFi

RenoFi is not a lender; it works with lending partners who make the loans. Queen Boss Construction is not a lender or a broker, does not arrange credit and takes no part in the application or the decision — we point you at them because clients keep asking who to talk to. All terms, rates and eligibility are between you and the lender.

What moves the number

Where the cost actually goes.

We do not publish prices, because a price quoted before the drawings exist is a number that changes. These are the four things that decide it, so you know what you are choosing between.

What strip-out finds

The largest single variable. Older houses hide rot, wiring and structure that was never right. A contingency is not optional here.

Structural change

Removing walls, raising ceilings and re-planning stairs each carry engineering and a permit.

Performance targets

How far you take insulation, air-tightness and glazing is a genuine choice with a genuine cost, and it pays back in comfort as well as bills.

Specification level

The same house can be finished three ways. We price the level you actually want rather than assuming one.

In their words

Read our client reviews.

Robert is a great communicator and we love working with him and his team.

Adam Peter S.

They are always professional and strive to provide exemplary customer service.

Shannon L.

Common questions

About renovation work.

Should we move out?

For a full strip-out, almost always — it is safer, faster and usually cheaper than working around a household. We will tell you honestly if your project is one of the ones that can be phased instead.

How do you handle what you find behind the walls?

Anything discovered is priced in writing and decided by you before it is done. No verbal change orders, and nothing appears on a final invoice that you have not already agreed.

Can it be done in phases?

Sometimes, and it costs more overall — every phase re-mobilises trades and re-opens work. Where the alternative is not doing it at all, that is still the right answer, and we will plan the phases so each one is a finished state.

Also from us

The rest of what we build.

Get started

Tell us about
your renovation.

A conversation and a walk through the rooms you are thinking about — no charge, and no obligation at the end of it.

704-323-5700 info@queenbossconstruction.com 400 Gilead Rd, Suite 2038 · Huntersville, NC 28070