Queen Boss Construction Queen BossConstruction

Bathrooms

A bathroom is a small room with a plumbing system, a drainage system, a ventilation system and a waterproofing system inside it. The finishes are what you see. The waterproofing is what decides whether the room is still perfect in ten years.

Honed marble Blackened steel Unlacquered brass

Before the finishes

What people actually
come to us about.

Nobody goes looking for a contractor in the abstract. These are the three things we hear first, and what we do about each of them.

Waterproofing is a system

Membrane, sloped bed, sealed corners and penetrations — specified and inspected before a single tile goes on.

Fall to the drain, measured

Built and checked, not eyeballed. It is why a shower dries between uses.

Behind-wall work photographed

Documented before it is closed, so ten years from now somebody knows what is in there.

The door and the swing

A door that swings the other way, or slides, is often the whole problem.

Fixtures scaled to the room

A smaller vanity with better storage beats a large one you edge past.

Glass instead of curtain

A clear screen gives the eye the whole floor and makes a small room read as one space.

Heated floor, decided early

It is cheap while the floor is open and expensive afterwards.

Ventilation that actually works

Sized, ducted outside and on a timer. Most bathroom problems are humidity.

Niches, blocking and rough-in

Grab-bar blocking and a niche in the right place cost almost nothing at framing.

Three ways to do it

The finishes you see. The work you don’t.

Stone, timber, brass and plaster are what the room is judged on; the waterproofing behind them is what decides whether it still looks like this in ten years. The photographs are references for a treatment rather than our own projects — bring us the one you keep coming back to.

Our process

How a bathroom actually runs.

Six stages, in order, with what you get at the end of each one. Nothing here starts until the stage before it is finished and signed off — which is the whole reason the schedule holds.

01

Survey the room

Existing falls, stack position, joist direction and what is under the floor. In an older house the answer to “can the bath go there” is usually decided by a joist you cannot see.

What you get

A clear answer on what can move and what cannot.

02

Layout and setting out

Fixtures placed against clearances and sightlines — what you see from the door matters more in a bathroom than in any other room. Niches, benches, screens and controls are positioned now, not improvised at tiling.

What you get

A plan, elevations for every wall, and a setting-out drawing for the tiler.

03

Selections

Tile, stone, brassware, sanitaryware, glass and lighting. Brassware is chosen early because the valve bodies go in behind the wall at first fix, and changing your mind later means opening it again.

What you get

A schedule with lead times, so nothing arrives after the trade that installs it.

04

First fix and waterproofing

Services, then the part nobody photographs: full tanking, correct falls to the drain, and a flood test before a single tile goes on. This is where bathrooms fail, and it is not visible afterwards.

What you get

Photographs of the tanking and the flood test, in your file.

05

Tiling and stone

Set out from the drawing so cuts land where they should — full tiles where the eye goes, cuts in the corners. Underfloor heating zoned and tested before it is buried.

What you get

A set-out you approve before adhesive is mixed.

06

Second fix and finish

Sanitaryware, brassware, glass, and the extraction commissioned and ducted outside rather than into a loft. Then the snag walk.

What you get

Commissioning notes, and the list closed with you.

What’s included

In every bathroom we build.

  • Full tanking and fall to drain, detailed on paper
  • Underfloor heating zoned to the room
  • Niches, benches and screens set out before tiling
  • Extraction sized properly, ducted outside

Need inspiration?

Our design team
will guide you.

Bring us the pictures you keep coming back to and our designers take it from there — working from the exterior style of the house, its proportions, its era and its materials, so every room reads as part of the same building rather than a set of separate good ideas.

One vision, carried through, inside and out. The image here is a reference for a treatment, not a photograph of one of our own projects.

Talk to a designer →
See 18 bathroom ideas → Named, explained and costed in plain language
Marble, aged brass and a double vanity

Before and after

The same room. The same footprint.

Nothing moved but the fittings and the finishes — the window, the door and the drain are exactly where they were. Most of what makes a bathroom feel new is specification and workmanship rather than square footage, which is why a room this size is usually the best-value work in the house.

What it takes

Three levels of bathroom work.

The figure under each level is where that scope typically starts in the Charlotte market — a starting point, not a quote. What follows is the work those numbers buy: what falls inside each level, in the order the decisions actually get made. The same three names run through our finish levels below, because the two questions — how much work, and to what standard — are answered together.

Essentialessential scope · bathroom

Starting at$100k

  • The existing footprint, kept
  • Entry-level semi-custom vanity
  • Granite or quartz top
  • Standard shower glass
  • Tiled shower and floor
  • Recessed lighting
  • Minimal plumbing and electrical reconfiguration
  • Waterproofing system inspected before tile
Typically 7+ weeks on site
Most chosen Signaturesignature scope · bathroom

Starting at$130k

  • Everything in Essential, plus:
  • Semi-custom vanity with a fitted interior
  • Quartz or natural stone top
  • Ultra-clear frameless glass
  • Upgraded tile pattern to the ceiling, accent wall
  • Heated floor
  • Full plumbing relocation and electrical reconfiguration
  • Wall removed and the layout reconfigured
Typically 7+ weeks on site
Estateestate scope · bathroom

Starting at$180k

  • Everything in Signature, plus:
  • Custom cabinetry and a double vanity with a tower
  • High-end stone, slab shower walls
  • Curbless wet room with a linear drain
  • Freestanding tub
  • Accent and mirror lighting on their own circuits
  • Expansion into adjacent closet or hall space
  • Water closet behind its own door
Typically 8+ weeks on site

Same Queen Boss craftsmanship at every level. Scope and finish are what move the number, never quality of workmanship — and you get an exact figure for your own project after the walk-through and the drawings, not before.

Define the finish

Selection & finish levels.

Two rooms of exactly the same size can cost dramatically different amounts, and the difference is selections. Cabinetry, countertops, tile, fixtures, lighting, appliances, doors, trim and hardware all move the number. These three tiers give us a shared language, so when you say “a $50,000 kitchen” we can talk immediately about what that realistically includes.

Essential~$135–$165 / SFFinishes only · excludes land, site work & structural

A clean, well-built home using quality builder-grade materials — the right choice when maximising budget toward square footage and structure matters most.

Most popularSignature~$165–$210 / SFFinishes only · excludes land, site work & structural

Upgraded materials and brands throughout that elevate everyday livability and long-term durability — without moving into full custom pricing.

Estate~$210–$275+ / SFFinishes only · excludes land, site work & structural

A full custom finish package with premium brands, natural materials, and designer detailing — built for clients who want the home to be a showpiece.

Per square foot, finishes only — excludes land, site work and structural. Same Queen Boss craftsmanship at every tier: the difference is customisation and material investment, never quality of workmanship.

Pre-construction investment

Three stages before a shovel goes in.

Pre-construction stageScopeInvestment
1 — Design & ArchitecturalComplete plan set: layouts, selections, construction drawings & renderings$2,000 – $4,000
2 — Structural EngineeringSite evaluation, calculations & engineer’s stamp (if required)$2,000 – $4,000
3 — City PermitPlan submission & city stamp · permit fees billed at costAt cost
Total pre-constructionFinal range confirmed once scope & areas are set$2,000 – $8,000+

Design, engineering and permit are priced separately from the build, so you can stop at any stage with a set of drawings you own outright.

Financing

Borrow against the house
it is going to be.

A renovation is usually worth more than the house was before it. RenoFi is built on that: their lending partners underwrite against your home’s after-renovation value rather than what it is worth today, which is why the number they can reach is so often larger than a standard home-equity offer.

Explore RenoFi → Opens RenoFi · a separate company
Up to 90%of after-renovation value, per RenoFi
$25k – $750krenovation home equity loans and HELOCs
Up to $75kpersonal loans, on credit and income
11×more on average than standard equity, per RenoFi

RenoFi is not a lender; it works with lending partners who make the loans. Queen Boss Construction is not a lender or a broker, does not arrange credit and takes no part in the application or the decision — we point you at them because clients keep asking who to talk to. All terms, rates and eligibility are between you and the lender.

What moves the number

Where the cost actually goes.

We do not publish prices, because a price quoted before the drawings exist is a number that changes. These are the four things that decide it, so you know what you are choosing between.

Moving the stack

Relocating the WC means new falls to the soil stack, and sometimes a new stack. The single biggest variable in a bathroom.

Underfloor heating

Worth it in almost every bathroom, but it raises the floor build-up, which affects doors, thresholds and sometimes the drain.

Tile size and format

Large-format and stone need a flatter substrate and more labour. Mosaic in a wet area is more grout, and more time.

Glass

Frameless and made-to-measure is a template, a lead time and a delivery. Off-the-shelf is neither.

In their words

Read our client reviews.

Robert is a great communicator and we love working with him and his team.

Adam Peter S.

They are always professional and strive to provide exemplary customer service.

Shannon L.

Common questions

About bathroom work.

Do I really need the room fully tanked?

In a wet area, yes. A tiled surface is not waterproof — the tanking behind it is, and a failure there is a ceiling downstairs a year later. It is the cheapest insurance in the whole job.

Can you do it without moving the plumbing?

Often, and it will cost less. We will tell you honestly whether the layout you want is worth the move or whether the room works where the services already are.

How long does a bathroom take?

It depends on scope, but the drying and curing times are fixed and cannot be rushed — screeds, tanking and grout all take what they take. We build those into the schedule rather than discovering them.

Also from us

The rest of what we build.

Get started

Tell us about
your bathroom.

A conversation and a walk through the rooms you are thinking about — no charge, and no obligation at the end of it.

704-323-5700 info@queenbossconstruction.com 400 Gilead Rd, Suite 2038 · Huntersville, NC 28070