Queen Boss Construction Queen BossConstruction

Kitchens

A kitchen is the most disruptive room in a house to renovate and the most expensive per square foot, because almost everything in it is either plumbed, wired, vented or load-bearing. Which is exactly why it is drawn to the millimetre before anything comes out.

White oak Honed marble Unlacquered brass

Before the finishes

What people actually
come to us about.

Nobody goes looking for a contractor in the abstract. These are the three things we hear first, and what we do about each of them.

The working triangle, then the traffic

Sink, hob and fridge placed for the cook, then the route everybody else takes through the room laid over it.

The island earns its width

Seating, prep, storage or a sink — an island that does none of them is a table you cannot move.

Wall removal studied properly

Whether the wall carries load, what it costs to take out, and whether the room is actually better without it.

Drawers, not cupboards

Deep drawers on full-extension runners hold more and reach further than a base cabinet with a shelf in it.

Full-height and pantry

Taken to the ceiling where the room allows, with the awkward top shelf given a purpose.

Fitted to what you own

Tray storage, appliance garage, bin runs and cutlery sized to your kitchen rather than to a standard.

The expensive things stay quiet

Cabinetry, stone and floor chosen to last. Colour and pattern go where they are cheap to change.

Ventilation sized for the hob

The single most-skipped item, and the one that keeps a kitchen feeling new.

Lighting in layers

Task, ambient and accent on separate circuits, so the room works at seven in the morning and at eight at night.

Three ways to do it

The room the whole house is judged on.

Layout first, then cabinetry, stone and light. These three are the same trades in three different moods — the photographs are references for a treatment rather than our own projects, so bring us the one you keep coming back to.

Our process

How a kitchen actually runs.

Six stages, in order, with what you get at the end of each one. Nothing here starts until the stage before it is finished and signed off — which is the whole reason the schedule holds.

01

The walk-through

We look at the room you have: where the services run, which walls are structural, where the light comes from and how you actually use the space. Most of what a kitchen will cost is decided by things visible on this visit.

What you get

A frank read on what is easy, what is expensive, and what is not worth doing.

02

Layout, before anything else

Two or three plans against how you cook — where you land shopping, where the bin goes, who else is in the room while you work. Appliance sizes and clearances are set here, because they decide the cabinetry.

What you get

A dimensioned plan, elevations of every run, and appliance schedule.

03

Selections, on a schedule

Cabinetry, stone, tile, fittings and lighting chosen against dates rather than whenever they come up. Stone is picked from the actual slab, not a sample chip — veining varies and a photograph will not tell you.

What you get

A written selections schedule with a decision date against each line.

04

Services redrawn

Gas, water, waste, circuits and ventilation moved to suit the new plan and drawn before a wall opens. Extraction is sized to the hob and ducted outside; a recirculating hood in a serious kitchen is a compromise, not a solution.

What you get

A services drawing, and a permit where the work needs one.

05

Strip out and first fix

Out to the substrate, then framing, services and any structural work. This is when surprises appear in an older house, and when having drawings means a surprise is a decision rather than a delay.

What you get

Weekly photographs and a schedule position you can see.

06

Cabinetry, stone, second fix

Cabinets set and scribed to the walls the house actually has. Stone is templated after the boxes are in — never before — then fabricated, and the room is finished around it.

What you get

A snag walk before we call it done, and the list closed with you.

What’s included

In every kitchen we build.

  • Layout studied against how you actually cook
  • Cabinetry drawn to the millimetre, not ordered from a catalogue
  • Stone slabs selected by you, from the slab
  • Ventilation, gas, water and circuits redrawn to suit

Need inspiration?

Our design team
will guide you.

Bring us the pictures you keep coming back to and our designers take it from there — working from the exterior style of the house, its proportions, its era and its materials, so every room reads as part of the same building rather than a set of separate good ideas.

One vision, carried through, inside and out. The image here is a reference for a treatment, not a photograph of one of our own projects.

Talk to a designer →
See 13 kitchen ideas → Named, explained and costed in plain language
Marble island, quartz perimeter, brass fittings

What it takes

Three levels of kitchen work.

The figure under each level is where that scope typically starts in the Charlotte market — a starting point, not a quote. What follows is the work those numbers buy: what falls inside each level, in the order the decisions actually get made. The same three names run through our finish levels below, because the two questions — how much work, and to what standard — are answered together.

Essentialessential scope · kitchen

Starting at$120k

  • The existing footprint, kept
  • Entry-level semi-custom cabinetry
  • Granite or quartz countertops
  • Recessed and under-cabinet lighting
  • Appliance package installed, not relocated
  • Minimal plumbing and electrical reconfiguration
  • New flooring in the kitchen
  • Extract sized to the hob
Typically 7+ weeks on site
Most chosen Signaturesignature scope · kitchen

Starting at$180k

  • Everything in Essential, plus:
  • Semi-custom cabinetry with a fitted interior
  • Quartz or natural stone, island in a feature slab
  • One wall removed, beam engineered and concealed
  • Full plumbing and electrical reconfiguration
  • Layered lighting plan on separate circuits
  • Flooring carried into the adjacent rooms
  • Panelled dishwasher and fridge
Typically 10+ weeks on site
Estateestate scope · kitchen

Starting at$225k

  • Everything in Signature, plus:
  • Fully custom cabinetry, drawn for your kitchen
  • Top-of-the-line stone, waterfall island
  • Butler’s pantry or scullery where the plan allows
  • Plaster or bespoke hood
  • Structural opening across the rear elevation
  • Windows enlarged or added
  • Fresh paint and trim through the connected rooms
Typically 10+ weeks on site

Same Queen Boss craftsmanship at every level. Scope and finish are what move the number, never quality of workmanship — and you get an exact figure for your own project after the walk-through and the drawings, not before.

Define the finish

Selection & finish levels.

Two rooms of exactly the same size can cost dramatically different amounts, and the difference is selections. Cabinetry, countertops, tile, fixtures, lighting, appliances, doors, trim and hardware all move the number. These three tiers give us a shared language, so when you say “a $50,000 kitchen” we can talk immediately about what that realistically includes.

Essential~$135–$165 / SFFinishes only · excludes land, site work & structural

A clean, well-built home using quality builder-grade materials — the right choice when maximising budget toward square footage and structure matters most.

Most popularSignature~$165–$210 / SFFinishes only · excludes land, site work & structural

Upgraded materials and brands throughout that elevate everyday livability and long-term durability — without moving into full custom pricing.

Estate~$210–$275+ / SFFinishes only · excludes land, site work & structural

A full custom finish package with premium brands, natural materials, and designer detailing — built for clients who want the home to be a showpiece.

Per square foot, finishes only — excludes land, site work and structural. Same Queen Boss craftsmanship at every tier: the difference is customisation and material investment, never quality of workmanship.

Pre-construction investment

Three stages before a shovel goes in.

Pre-construction stageScopeInvestment
1 — Design & ArchitecturalComplete plan set: layouts, selections, construction drawings & renderings$2,000 – $4,000
2 — Structural EngineeringSite evaluation, calculations & engineer’s stamp (if required)$2,000 – $4,000
3 — City PermitPlan submission & city stamp · permit fees billed at costAt cost
Total pre-constructionFinal range confirmed once scope & areas are set$2,000 – $8,000+

Design, engineering and permit are priced separately from the build, so you can stop at any stage with a set of drawings you own outright.

Financing

Borrow against the house
it is going to be.

A renovation is usually worth more than the house was before it. RenoFi is built on that: their lending partners underwrite against your home’s after-renovation value rather than what it is worth today, which is why the number they can reach is so often larger than a standard home-equity offer.

Explore RenoFi → Opens RenoFi · a separate company
Up to 90%of after-renovation value, per RenoFi
$25k – $750krenovation home equity loans and HELOCs
Up to $75kpersonal loans, on credit and income
11×more on average than standard equity, per RenoFi

RenoFi is not a lender; it works with lending partners who make the loans. Queen Boss Construction is not a lender or a broker, does not arrange credit and takes no part in the application or the decision — we point you at them because clients keep asking who to talk to. All terms, rates and eligibility are between you and the lender.

What moves the number

Where the cost actually goes.

We do not publish prices, because a price quoted before the drawings exist is a number that changes. These are the four things that decide it, so you know what you are choosing between.

Moving water and waste

Relocating a sink or a run of waste means new falls and sometimes a new stack. It is the single most common reason a kitchen budget moves.

Taking a wall out

A structural opening needs an engineer, a beam and a permit. Worth doing, worth knowing about at week one rather than week six.

Cabinetry, made or bought

Made-to-measure fits the room you have and costs what it costs. Catalogue boxes cost less and need fillers where the walls are not square.

The stone

Slab, thickness, edge detail and how many seams. A waterfall end on a large island is a second slab before it is anything else.

In their words

Read our client reviews.

Robert is a great communicator and we love working with him and his team.

Adam Peter S.

They are always professional and strive to provide exemplary customer service.

Shannon L.

Common questions

About kitchen work.

How long will I be without a kitchen?

For a full renovation, expect the room to be out of use from strip-out to second fix. We set a date before we start, tell you every week whether it still holds, and can usually rig a temporary sink and worktop elsewhere in the house.

Can you work with a designer I have already hired?

Yes. We will review their drawings, tell you what the house and the code will actually allow, and price the work from them.

Do I have to buy the appliances before you start?

You have to have chosen them. Cabinetry is drawn around exact appliance dimensions, so the models are fixed at design stage even if they are delivered much later.

Also from us

The rest of what we build.

Get started

Tell us about
your kitchen.

A conversation and a walk through the rooms you are thinking about — no charge, and no obligation at the end of it.

704-323-5700 info@queenbossconstruction.com 400 Gilead Rd, Suite 2038 · Huntersville, NC 28070